Main aeration blowers at WWTP Blagoevgrad

Main aeration blowers at WWTP Blagoevgrad

Five blower units with total installed power of 375kW applied for wastewater aeration process.

 

Each blower has a flowrate of 3000m3/h and installed power of 75kW.

 

 

 

 