Our projects

Plate diffuser aeration system installation at industrial WWT plant

Plate diffuser aeration system installation at industrial WWT plant

This example shows an aeration system using plate diffusers at an industrial WWTP.
With the selection of plate diffusers, aeration efficiency is increased and overall installation cost is decreased thanks to the need of less distribution pipes and supports.
The aeration system includes the whole necessary piping distributing the air and the stainless steel support to the tank bottom.

A WIDE RANGE OF CLIENTS WHO TRUST US

Head Office: (Map) Iliyantsi Blvd No 119 1220 NPZ Voena Rampa, Sofia, Bulgaria T +359 2 971 8960 F +359 2 971 89 61

Service Center: (Map) Iliyantsi Blvd No 119 1220 NPZ Voena Rampa, Sofia, Bulgaria T +359 2 931 0700 F +359 2 971 89 61

cron